winter-proofing and renovation is a complex process
Update posted by Robert Lauderdalethis floor plan will take Jenna
from this bathroom
and this tent where she was sleeping for 423 days
to this shell of a caravan that is completely empty inside it has just the shown door and a single window
BILL OF MATERIALS MASTER BEDROOM
PRICES ARE WITHOUT VAT AND DELIVERY CHARGES
This list of materials approximates what is needed to Create the master bathroom/bedroom
The Master bathroom is part of the master bedroom and both have to be Done together
In addition, the complete flooring for the caravan must be done to keep
The structure together to do just a piece of flooring in not advised
ALL PRICES ARE ESTIMATES BECAUSE OF THE FLUCTUATION OF AMERICAN DOLLAR, SCHECKLE PRICES
ARE TAKEN FROM BIDS BY LOCAL VENDORS FOR MATERIAL
Septic system is required to collect the wastewater and body wastes 4,700usd16,200nis
6000liter 2 phase fitering system concrete construction
4000liter primary solid waste hold
2000liter secondary liquid waste dispersal system to ground
For the entire floor which need to be done so that baby has a clean environment
And can be placed on floor to play, etc
3 rolls tar paper as a barrier between temp floor and new flooring 257usd 900nis
15 4x8 sheets of green MDF for flooring140nis ea598usd 2100nis
50 sq meters vinyl tile for entire floor
Frame 5 walls and ceiling with 2x4x8 pine boards
The proposal is to construct walls and ceiling framing of 16” centers
This would require approximately
50 2x4x8 pine boards allowing for bracing between studs,
20 4x8 plaster board for walls@50nis each245usd1000nis
Windows / doors / cabinets–
2 reg window for bedroom100x100cm1000nis ea570usd2000nis
2 Bedroom door and frame1500nis ea428usd1500nis
Medicine chest or bathroom with mirror126usd 440nis
Wiring and plumbing requirements
2 48 liter bottle gas for hot water and wall heaters setup charge371usd1300nis
Recurring charge 350nis bi monthly100usd350nis
Plumbing
80 liter Propane gas hot water tankapprox.342usd1200nis
2 lp gas wall heaters257usd900nis
Propane gas lines 20metersapprox.43usd150nis
Bathroom Sink and cabinet184usd 650nis
Toilet and toilet seat184usd 650nis
Bath tub/shower
Connection to septic tank for bath and toilet 15metersapprox.43usd150nis
Bathroom vent fan
Hot and cold water lines 25 feet each ½ inch pvc
Electrical
2 Led light fixtures for bedroom and bathroom@75nis each43usd150nis
7 Electrical points for bedroom/bathroom@50nis ea43usd150nis
3 GFI switches 94usd330nis
5 breaker Switches 94usd 330nis
Wires
Wiring 60 metersapprox.200usd700nis
Fuse box for 30 breakers and 2 timer switches43usd 150nis
Essentials
Baby changing table257usd900nis
Front door must be replaced with steel safety door as required
By law for homes, current door is for storage areas
SUB-TOTAL S22,500USD 32,035NIS
ISRAEL VAT 17% 1,551USD 46NIS
TOTAL S10,673USD 80,000NIS