Nov 17, 2019 at 09:38 pm

winter-proofing and renovation is a complex process

Update posted by Robert Lauderdale

this floor plan will take Jenna

from this bathroom

and this tent where she was sleeping for 423 days

to this shell of a caravan that is completely empty inside it has just the shown door and a single window


BILL OF MATERIALS MASTER BEDROOM

PRICES ARE WITHOUT VAT AND DELIVERY CHARGES

This list of materials approximates what is needed to Create the master bathroom/bedroom

The Master bathroom is part of the master bedroom and both have to be Done together

In addition, the complete flooring for the caravan must be done to keep

The structure together to do just a piece of flooring in not advised

ALL PRICES ARE ESTIMATES BECAUSE OF THE FLUCTUATION OF AMERICAN DOLLAR, SCHECKLE PRICES

ARE TAKEN FROM BIDS BY LOCAL VENDORS FOR MATERIAL

Septic system is required to collect the wastewater and body wastes 4,700usd16,200nis

6000liter 2 phase fitering system concrete construction

4000liter primary solid waste hold

2000liter secondary liquid waste dispersal system to ground

For the entire floor which need to be done so that baby has a clean environment

And can be placed on floor to play, etc

3 rolls tar paper as a barrier between temp floor and new flooring 257usd 900nis

15 4x8 sheets of green MDF for flooring140nis ea598usd 2100nis

50 sq meters vinyl tile for entire floor

Frame 5 walls and ceiling with 2x4x8 pine boards

The proposal is to construct walls and ceiling framing of 16” centers

This would require approximately

50 2x4x8 pine boards allowing for bracing between studs,

20 4x8 plaster board for walls@50nis each245usd1000nis

Windows / doors / cabinets–

2 reg window for bedroom100x100cm1000nis ea570usd2000nis

2 Bedroom door and frame1500nis ea428usd1500nis

Medicine chest or bathroom with mirror126usd 440nis

Wiring and plumbing requirements

2 48 liter bottle gas for hot water and wall heaters setup charge371usd1300nis

Recurring charge 350nis bi monthly100usd350nis

Plumbing

80 liter Propane gas hot water tankapprox.342usd1200nis

2 lp gas wall heaters257usd900nis

Propane gas lines 20metersapprox.43usd150nis

Bathroom Sink and cabinet184usd 650nis

Toilet and toilet seat184usd 650nis

Bath tub/shower

Connection to septic tank for bath and toilet 15metersapprox.43usd150nis

Bathroom vent fan

Hot and cold water lines 25 feet each ½ inch pvc

Electrical

2 Led light fixtures for bedroom and bathroom@75nis each43usd150nis

7 Electrical points for bedroom/bathroom@50nis ea43usd150nis

3 GFI switches 94usd330nis

5 breaker Switches 94usd 330nis

Wires

Wiring 60 metersapprox.200usd700nis

Fuse box for 30 breakers and 2 timer switches43usd 150nis

Essentials

Baby changing table257usd900nis

Front door must be replaced with steel safety door as required

By law for homes, current door is for storage areas

SUB-TOTAL S22,500USD 32,035NIS

ISRAEL VAT 17% 1,551USD 46NIS

TOTAL S10,673USD 80,000NIS