Nov 01, 2019 at 01:35 am
Update - 3 Water tank tower
Update posted by John GumboThe tower construction is now complete. We have sent the school a total of USD915 for the materials and part of the construction costs which has depleted funds available. We still need USD145 to pay the balance for tower construction and USD140 to build a concrete slab before the tank can be installed on top of the tower.