Mar 21, 2018 at 01:08 pm

We did it!

Update posted by Anna Barros

It is with extreme pleasure and excitement that we can finally announce that we are moving!

As of March 20th 2018, we have signed the lease on a new space in Queens Road Peckham. The space is a 1200 sq ft railway arch with its own bathroom and kitchen (and electrics that work, and insulation!). The venue is street level so it is also wheelchair accessible.

It is located a 2 min walk away from Queen Road Peckham station which is on the overground network. It is one train stop away from London Bridge and two stops away from Canada Water (Jubilee Line). Both Peckham Rye station and New Cross gate stations are a 15mins walking distance (or you can take a short bus). Take a look at the map here for transport connections. The studio is also a 5 min walk away from a Tesco, and various coffee shops, restaurants and pubs

The space ticks all the boxes regarding location, price, and proximity to shops and the main road. Additionally it is self-contained (with own bathroom and kitchen) and with proper electrical power and insulation.

The main modification to the space we will need to do is build a structure for suspension work. This, alongside the deposit will be our main immediate cost and priority. We are aiming to have this ready before the move in date (which is TBC still) but sometime in May 2018. We are already in touch with companies to obtain estimates.

Thank you for your patience and for your support!

More soon :)

Anna









Back to campaign page