Jun 02, 2021 at 01:08 pm

Power Outage #1 (Load shedding)

Update posted by Nikolas Jankovich

On Monday I launched my "solar energy" campaign to make possible an off-grid solar powered solution, that would enable me to provide solar power to the pump in the well/borehole on the olive grove, so that when the electrical utility switched off the power, I would be able to use the solar energy to power the pumps!

In order to highlight the disruptive effects that occur when the power utility (ESKOM) turns off the power, I am going to add a campaign update every time the power is turned off showing the schedule of the times of when the power will be turned off.

There are various stages that are applied dependent on how much electricity the utility can supply the country. Currently, stage 2 is what we will expect in so far as when the duration and the time allocated for the power outage.

Stage 2 was applied today. No Power at all.

Please support my "Water for Life/Solar Solution" campaign so that the olive grove can get off the grid.

Back to campaign page