Nov 18, 2018 at 12:45 pm

Post Operations

Update posted by Penelope Allyson

The operation, Patent Ductus Arteriosus with Cardio Pulmonary Bypass, done last October 29, was successful. However, Pierre was found to have an infection post surgery - one that causes his heart rate to fluctuate between 70bpm to 150bpm - and requires intensive antibiotic treatment for a duration of four weeks at the Philippine Heart Centre. Currently his bill size is about 400,000 Pesos which equates to about $10,500SGD. His bill will continue to rise as he is still hospitalized for strict monitoring. We are again knocking on your kind hearts to assist us with settling his hospitalization bill.

Back to campaign page