SPF: AGAVE-AFEDOME COMMUNITY RELIEF FUND
Fundraising campaign by
SOCIALPLEDGE FOUNDATION
-
US$0.00Donated So Far
The campaign owner has stopped the page from accepting further donations. Please contact them if you'd still like to donate
Campaign Story
“By means of water, we give life to everything.” » Koran
At Socialpledge Foundation we focus our activities on helping
underprivileged families and their communities who rely on limited
resources and mostly live an unfulfilled lives.
This year SPF has taken on a project in the Agave-Afedome community located south of the Tongu district in the Volta region of Ghana. In assessing the water needs of the people in the community, it was found that the largest barrier to the health of the community people is lack of clean and safe drinking water and low sanitation and hygiene standards.
The entire people in the community rely solely on an untreated river water for all domestic purposes. Our research shows these common diseases among the people; diarrhea, Typhoid Fever, Eye Infection, Skin and/Scalp Infection, Schistosomiasis and Malaria.
Our goal is to raise funds to construct a borehole and install a water pump in order to provide the community with clean and safe sustainable supply of drinking water under holistic WASH (Water Access, Sanitation and Hygiene) approach.
In brief, we are asking you, as Donor, to provide funding for any part of the projects underlined, in detail below.
If you wish to support us by making payment via PayPal, please visit our online page http://socialpledgefoundation.org/donate.html
The overall total cost for the Borehole Water Pump Construction Project at Agave-Afedome community is estimated at US$ 4,347.85[1] (19,217.50 GHS)
Project Budget: Borehole and water pump for Agave community |
Costs |
Overall costs (in GHS) |
Overall costs (in USD) 4,42 GHS= 1 USD |
|||
Unit |
No. of units |
Price per unit (in GHS) |
||||
1. Personal costs - subtotal |
0,00 |
0,00 |
0,00 |
0,00 |
||
2. Travel costs |
||||||
2.1 Local transportation in and out |
journey per person |
10,00 |
50,00 |
500,00 |
113,12 |
|
2.2 Rent of the van (in and out) |
journey |
1,00 |
560,00 |
560,00 |
126,70 |
|
2.3 Accommodation (5 nights) |
night per person |
5,00 |
350,00 |
1 750,00 |
395,93 |
|
2.4 Food (6 days) |
per person |
5,00 |
120,00 |
600,00 |
135,75 |
|
2. Travel costs - subtotal |
3 410,00 |
771,49 |
||||
3. Equipment and supplies of goods (only for the project purposes, specified) |
||||||
3.1 Intangible fixed assets (software, research results...) |
0,00 |
0,00 |
0,00 |
0,00 |
||
3.2 Tangible fixed assets (land, building, movable things (usability duration > 1 year) |
0,00 |
0,00 |
0,00 |
0,00 |
||
3.3 Communication cost (telephone…) |
team (whole project) |
1,00 |
100,00 |
100,00 |
22,62 |
|
3.4 Material |
0,00 |
0,00 |
0,00 |
0,00 |
||
3.5 Other equipment (specify) |
0,00 |
0,00 |
||||
3.5.1 Water pump |
incl |
0,00 |
0,00 |
0,00 |
0,00 |
|
3.5.1 Maintenance equipment (spare parts, equipment...) |
piece |
1,00 |
350,00 |
350,00 |
79,19 |
|
3.5.2 Plastic tank |
piece |
1,00 |
250,00 |
250,00 |
56,56 |
|
3.5.3 Tent |
piece |
1,00 |
40,00 |
40,00 |
9,05 |
|
3.5.4 Plastic chairs |
piece |
50,00 |
5,00 |
250,00 |
56,56 |
|
3.5.5 Plastic table |
piece |
2,00 |
15,00 |
30,00 |
6,79 |
|
3. Equipment and supplies - subtotal |
1 020,00 |
230,77 |
||||
4. Direct costs in place of realization (only for project purpose) |
||||||
4.1 Small material (e.g.: office supplies) |
project |
1,00 |
100,00 |
100,00 |
22,62 |
|
4.1.1 Padlock for water pump |
piece |
1,00 |
50,00 |
50,00 |
11,31 |
|
4.2 Other direct costs in place of realisation (specify) |
||||||
4.2.1 Refreshment for visitors of the project (drink and pie) |
||||||
Drinks |
project |
700,00 |
2,00 |
1 400,00 |
316,74 |
|
Sachet water |
project |
appx. 1000 |
0,20 |
200,00 |
45,25 |
|
Meat pie |
project |
700,00 |
2,00 |
1 400,00 |
316,74 |
|
4. Direct costs in place of realisation - subtotal |
3 150,00 |
712,67 |
||||
5. Sub-supplies (services fully secured by external delivery) |
||||||
5.1 Exploration, construction, installation, service, secure and other technical work |
included |
0,00 |
0,00 |
0,00 |
0,00 |
|
5.1.1 Borehole drilling and construction |
item |
1,00 |
6 000,00 |
6 000,00 |
1 357,47 |
|
5.1.2 Pump installation |
work |
1,00 |
2 500,00 |
2 500,00 |
565,61 |
|
5.1.3 Installation of fittings |
work |
1,00 |
500,00 |
500,00 |
113,12 |
|
5.2 Expert services (expert study, technical documentation, research, law and economic advice etc.) |
0,00 |
|||||
5.2.1 Hydro-geological survey for borehole sitting |
work |
1,00 |
500,00 |
500,00 |
113,12 |
|
5.2.2 Pump test and water quality analysis |
work |
1,00 |
500,00 |
500,00 |
113,12 |
|
5.3 Transportation of material and goods |
included |
0,00 |
0,00 |
0,00 |
0,00 |
|
5.4 Rent for movable things (machines, etc.) |
included |
0,00 |
0,00 |
0,00 |
0,00 |
|
5.5 Copy and print |
project |
1,00 |
50,00 |
50,00 |
11,31 |
|
5.6 Financial services (bank fares etc.) |
fare |
1,00 |
3,00% |
560,00 |
126,70 |
|
5.10 Other (specify) |
0,00 |
0,00 |
||||
5.10.1 Flyer about water, hygiene, sanitation (contact printing companies) |
flyer |
750,00 |
1,37 |
1 027,50 |
232,47 |
|
5. Sub-supplies - subtotal |
11 637,50 |
2 632,92 |
||||
6.Total costs |
19 217,50 |
4 347,85 |
For all budget the exchange rate of 4,42 GHS = 1 USD (Oanda.com, 14. 8. 2017) was used.
If you can’t give but still want to support our cause, please share our page with your friends, family members, and coworkers. With more people aware of our cause, we will be one step closer to reaching our goal.
The team at Socialpledge Foundation would like to thank you for in advance for your support.
Organizer
- SOCIALPLEDGE FOUNDATION
- Campaign Owner
- Accra, GH
An active volunteer and a humanitarian.
An active volunteer and a humanitarian.
No updates for this campaign just yet