Aug 27, 2019 at 08:25 am
The hardest part completed
Update posted by Ivan IvanovThe whole which you saw on the last update was 3 meters deep and 2.5 wide, which took a lot of work after that the tank was put inside and it was well sealed. Also the part where the water will go through the sand filter is ready.
Now what is left is to put the filtration sand, the waterproof membrane and connect the whole system with the pump and we are already 98% percent funded.