Dear All,


We are pleased to share the next progress updates. The sedimentation tank and filters have been fitted including hypochlorite dosing system. Galvanized handrail and stairs have also been installed to facilitate easy and safe access.

  • Intake:
    • Construction of Pontoon (Completed)
    • Construction of Steps to Pontoon (Completed)
    • Installation of Pump including Accessories (Completed)
    • Suction Pipes (Completed)
    • Outlet Pipes (Completed)
  • Supply of Pipes and Fittings, Pipe laying works and installation & construction:
    • Pipe for Raw water HDPE PN 10 from Intake to Water Treatment Tank (Completed)
    • Pipe HDPE PN10 from Clear Water Tank to High Tank (Completed)
  • Electricity System (Completed)
  • Water Treatment Facilities 20m3/hr
    • Earth Work (Completed)
    • Concrete Work (Completed)
    • Filter Underdrain and Filter Media (Completed)
    • Pipe Gallery (Completed)
    • Steel Works and Miscellaneous (Completed)
  • Clear Water Tank 30m3 and Pump House
    • Earth Work (Completed)
    • Concrete Work (Completed)
    • Steel Works and Miscellaneous (Completed)
    • Inlet Pipes, Overflow, Drain, Suction and Outlet Installation (Completed)
  • Transfer Pump (Completed)